MEGABUILD OFFICIALLY AWARDED TWO CONTRACT PACKAGES FOR THE 315 International Maternity Hospital Tay Ninh PROJECT

Megabuild continues to strengthen its position in the construction industry as it has officially been entrusted by SOUTHERN VCV JOINT STOCK COMPANY to deliver two contract packages for the 315 International Maternity Hospital Tay Ninh Project.
📍 Project Information
• Project: 315 International Maternity Hospital Tay Ninh
• Location: Land Parcel 636, Map Sheet No. 214, Quarter 12, Tan Ninh Ward, Tay Ninh Province, Vietnam
• Scale: 1 basement and 9 above-ground floors
• Client: SOUTHERN VCV JOINT STOCK COMPANY
🔹 Megabuild’s Scope of Work
Contract Package 01: Supply and installation of production foundation piles.
Contract Package 02: Main contractor for structural works, architectural finishing works, and Mechanical, Electrical & Plumbing (MEP) systems.
Being entrusted with two major contract packages for this project reflects the confidence our Client places in Megabuild’s construction capabilities, quality standards, and reputation—values we have continuously built and strengthened throughout our journey.
With an experienced team and a professional working approach, Megabuild is committed to delivering the project on schedule while ensuring the highest standards of quality and safety, creating sustainable value for our Client.
Share:

Related News

09/12/2026
News - Events

Đào Tạo Và Phát Triển Nhân Sự – Chủ Điểm Tháng 9/2026

Con người là nền tảng quan trọng cho sự phát triển bền vững. Trong hành trình chào mừng 15 năm thành lập, Megabuild triển khai chuỗi hoạt động đào tạo trong tháng 9 với các nội dung: 🔹 Đào tạo hội nhập 🔹 Đào tạo AI và cách sử dụng hiệu quả 🔹 Hội thảo […]

07/02/2026
Projects News

MEGABUILD OFFICIALLY BREAKS GROUND ON THE RBFs FACTORY BUILDING PROJECT – PHASE 2 AT VSIP III

March 26, 2026 marked a significant milestone for Megabuild as we proudly held the Groundbreaking Ceremony for the Ready-Built Factory (RBFs) Phase 2 Project at VSIP III Industrial Park, Binh Duong, reaffirming our expertise and commitment in the field of industrial design and construction. The RBFs Phase 2 Project is being developed across Subzones 2.5, […]

08/08/2026
Projects News

MEGABUILD TEAMBUILDING 2026: “ONE TEAM – ONE GOAL”

From July 31 to August 02, 2026, Megabuild Corporation successfully organized its Teambuilding & Gala Dinner 2026 under the theme “ONE TEAM – ONE GOAL” at Binh Tien Beach & Vinh Hy Bay. The trip was a fantastic opportunity for all office staff and project management teams to connect and strengthen solidarity. Throughout the journey, […]

06/30/2025
Projects News

GROUNDBREAKING CEREMONY SUN CASA SQUARE PHASE 3.1 PROJECT

On the morning of June 30, 2025, Megabuild officially commenced construction of the Sun Casa Square Project – marking an important milestone and the beginning of a development expected to contribute to building a modern, high-quality urban area within Sun Casa, Binh Duong Province. Sun Casa Square – Developed by VSIP, Sun Casa Square is the […]

06/17/2025
Projects News

Megabuild Successfully Completes and Hands Over the Phase 1A RBF Project at VSIP Industrial Park

On 31 January 2026, Megabuild Corporation completed and handed over Phase 1A of the Ready-Built Factory (RBF) Project. For the RBF 1A Project, Megabuild served as the main contractor for construction, finishing works, MEPF systems, and rooftop solar power installation for two adjoining factory buildings with a total floor area of 24,170 m². The project […]